SEM655D
Advantage:
- Excessive productivity
- Exceptional-in-class Reliability and durability
- Amazing gasoline financial system
- Terrific Operator consolation
Application:
- Coal
- Quarry
- Water Conservancy
- Hydropower
- Railway
- Toll road
- Airport
- Tunnel
- Log Grapple
- Port
- Concrete
Key Specification:
- Rated Payload : 5,000kg
- Operating Weight with preferred Bucket : sixteen,800kg
- Bucket ability : 2.7-4.5m³
Weichai Engine
- Low velocity engine with E-fan presents accelerated running performance
- better gasoline pre-filter eliminates water and contaminant from gasoline for best gas machine safety
- The air purifier affords device reliability even within the maximum extreme packages
Cummins Engine
- Optimized low velocity torque functionality and device productiveness
- sturdy torque shipping results in better breakout pressure
- high-quality-in-class gas efficiency
Machine Applications
- The strong design of the 655D makes it the right machine for massive volume earthmoving applications
- In Hopper feeding and Coal loading applications the 655D can load more, circulate faster and burn less gas
- Multiple work tools are to be had for increased versatility
Efficient Hydraulic System
- Dual pump waft merging hydraulic device will increase system efficiency
- The optimized hydraulic system paired with the force train reduces device cycle time and increases productiveness
- Joystick hydraulic manipulate for smooth and particular operation
Operator Station
- Premium operator station with massive space and superior visibility
- Patented MAC mount offers much less noise and extended consolation
- Adjustable suspension seat
- Sliding facet window and AC with fresh air stream offer operator comfort
- Single lever moving is flexible and convenient
- Adjustable air waft outlet promises better defrost overall performance
Dependable Drivetrain
- Countershaft transmission with upgraded core components gives high reliability
- Huge rim-pull in 1st equipment and better speed in 2nd equipment offer high efficiency for load and convey packages
- Take hold of cutoff choice transfer guarantees solid and safe operation
- Torque convertor structure is straightforward and performance is high
- The SEM designed and constructed axle offers nice in magnificence performance in heavy obligation programs
Superior Cooling Gadget
- The usual cooling package provides excessive reliability in 50℃ ambient situations.
- Surprise pad mounts make sure reliability below excessive packages
- Solid structure
- Systems go through Finite detail evaluation (FEA) and On gadget strain analysis (OMSA) to make sure durability
- Performance series (ps) buckets enhance loading capability
Serviceability
- Device strain test ports are widespread
- Huge perspective engine hood side open door affords easy provider access
- Torque convertor is remoted from transmission making it easy to carrier
Safety
- Safety design complies with all regulatory requirements
- Caterpillar production machine (CPS) leveraged in production method
- 3-factor touching layout gives convenient operator getting into to cabin
- Backup alarm ensures gadget safety
- Environmentally pleasant painting manner
How to Operate a Wheel Loader ( SEM655D )
1: Earlier than the loader begins normally, you must ship out the vital sound signals to warn pedestrians and different automobiles. at the same time, raise the bucket with the aid of 500mm from the floor. at some stage in driving, you need to take a look at the reliability of the brakes and avoid roadblocks or excessive voltage lines deliberately.
Most significantly, the front quit loader does not take other employees besides the regular operator and simply disallow to carry human beings with the wheel loader bucket.
2: Whilst the the front wheel loader is using at high speed, you ought to hold the front-wheel power. however, in relation to low-speed scooping, you ought to perform it for 4-wheel drive. similarly, it's miles vital to keep away from sudden steerage and sharp turn or emergency braking after loading.
3: In the technique of the articulated wheel loader is loading, you want to determine the loading amount according to the density of materials. however, the driving force need to lift the loader arm to show the bucket and decrease the speed of motion.
4: The backhoe increase need to be located within the floating role to push the bucket easily when front give up wheel loader is operating on the unfastened and choppy web site. however, if the backhoe boom moves up or all the way down to the most restriction, you must go back the joystick to a neutral function.
5: As a very good operator, you ought to now not push the manage too tough anyways. in addition, you can't descend the loader arm quickly when it is complete of weight.
6: Don’t elevate the bucket to the very best position to move substances. maintain clean of the front stop loader in the using manner.
7: At some stage in carrying out loading or excavation, it's miles necessary to avoid partial loading of the bucket. After the bucket is complete of fabric, you should raise bucket booms of the front give up loader with the aid of 500mm from the ground before turning returned to sell off.
8: Stop loading right now wheel slip takes place because of massive shovel loading resistance.
9: Before unloading substances to the sell off truck, it is advisable to lessen the unloading top.
10: It is forbidden to touch the working part or overhaul below the loader is running. before repairing the work tool, descend it to the lowest role. at the identical time, it's far vital to place a few square timbers beneath the suspended component. In phrases of maintenance, do not stand between the the front and rear frame for related operations. especially before the articulated wheel loader bogie isn't always locked.
11: Unloading on the facet slope, keep the gap between the tire and the threshold greater than 1.5m. If the slope is extra than 30 levels, do no longer sell off with tip ahead.
12: The water temperature of the internal combustion engine have to now not exceed ninety five ℃ while it really works. meanwhile, torque converter oil temperature should be decrease than 120 ℃.
13: Prevent working the wheel loader straight away if any of the following happens. as an example, the soil great inside the creation location is risky, fall apart, thunderstorm and flash flood.
14: If the operator leaves the cab, land the bucket and close off the engine, please.
15: On the give up of working, the operator need to power the wheel loader to a secure vicinity. Then, placed the bucket flat at the floor and the deal with inside the impartial position. leave construction web page after ultimate the door and window of the cab definitely.
End
Existence for us or others is handiest once. Many accidents take place because we constantly suppose “No, it’s not possible”. consequently, we should acquire front stop loader training earlier than running it. This is not simplest the expert requirement of the loader driving force however also our obligation for families.
Comments
Post a Comment